-
Simple shapes
Modern Panels
Traditional Panels
Borders
Relief Zellige
-
Choose a colour
- 1001
- 1002
- 1003
- 1004
- 1005
- 1008
- 1009
- 1010
- 1011
- 1012
- 1013
- 1014
- 1015
- 1016
- 1017
- 1018
- 1019
- 1020
- 1021
- 1022
- 1024
- 1025
- 1026
- 1030
- 1031
- 1034
- 1035
- 1036
- 1037
- 1038
- 1040
- 1041
- 1042
- 1043
- 1044
- 1045
- 1046
- 1049
- 1050
- 1052
- 1056
- 1057
- 1058
- 1059
- 1060
- 1061
- 1062
- 1064
- 1065
- 1066
- 1070
- 1072
- 1073
- 1075
- 1076
- 1077
- 1078
- 1079
- 1080
- 1081
- 1082
- 1083
- 1085
- 1086
- 1087
- 1088
- 1089
- 1090
- 1092
- 1094
- 1095
- 1096
- 1101
- 1102
- 1103
- 1104
- 1105
- 1106
- 1107
- 1115
- 1116
- 1117
- 1118
- 1121
- 1122
- 1123
- 1124
- 1125
Simulator colours are indicative, ask for samples
"Metal" Colours Tiles covered with a very thin metallic film in Golden, Copper or Silver color. The tile is then protected with synthetic varnish. These tiles might oxidate and evolve progressively or spontaneously. They should not be cut or placed in wet areas.
Choose a shape
-
Simulation of a 30x30 area Download
- Tile reference:
- Virtual assembly: ...
- Price / m² Excl. VAT (For loose tiles): ...
- Simulation colour: ...
Your simulation, 4 weeks production + shipping 2-3 weeks
Minimum order 3 m²- Required surface area (m²)
- Required surface area (m²)
- Quote excl. VAT and transport
Delivery in approx. 10-15 working days.
Shipping costs depend on the weight of the order and post code of delivery.
The pallet will be unloaded on the street or pavement, in a location accessible to a delivery lorry with a tailgate and a hand pallet truck.
We do not provide the dismantling of the pallet and the transfer of the boxes to the construction site or on upper floors.
The customer must review the pallet and its contents upon delivery.
Any complaints should include pictures.
Calculate Transport and pre-position options
Send this image to our customer service teamFor complex designs and quotations
-
- Price / piece Excl. VAT (For loose tiles): ...
- Tile reference: ...
- Colour code: ...
Your simulation, 4 wks production + shipping 2-3 wks
- Numbers of tiles
(Minimum 50 pieces per reference and colour) - Quote excl. VAT and transport
Delivery in approx. 10-15 working days.
Shipping costs depend on the weight of the order and post code of delivery.
The pallet will be unloaded on the street or pavement, in a location accessible to a delivery lorry with a tailgate and a hand pallet truck.
We do not provide the dismantling of the pallet and the transfer of the boxes to the construction site or on upper floors.
The customer must review the pallet and its contents upon delivery.
Any complaints should include pictures.